Secondary Lining Trolley With the development of construction intelligence, our company has developed a tunnel intelligent information management system. It adopts PLC intelligent integrated control and mainly integrates: Arch crown concrete anti-void detection、Arch crown pouring pressure detection、
Smart Hanging Basket·Monitoring of anchoring force, anchor rod tension and main truss stress of the hanging basket.·Monitoring of hanging basket deflection and cylinder pressure.·Monitoring of on-site temperature,humidity and wind speed.·Monitoring of the overall posture of the hanging basket.·Synch